沈先生尺寸有多大,芸能界演艺圈1314芸能,电影《婚前检查》

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 济阳县| 雅安市| 兰溪市| 四平市| 句容市| 鹤岗市| 礼泉县| 康平县| 石河子市| 嵩明县| 蓬莱市| 浮梁县| 威宁| 定日县| 饶阳县| 云霄县| 合川市| 江陵县| 鹰潭市| 古丈县| 建瓯市| 河西区| 龙游县| 宝丰县| 同仁县| 明光市| 浠水县| 崇仁县| 黎城县| 广水市| 安顺市| 张北县| 湘阴县| 理塘县| 墨竹工卡县| 榆树市| 湖南省| 九寨沟县| 庐江县| 沾化县| 曲松县|