沈先生尺寸有多大,芸能界演艺圈1314芸能,电影《婚前检查》

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Jintai machine constructed in Egypt

2009-11-10

    The second stage project of Said port Egypt is located in the north of Suez Canal. This project is to make a dock with the square piles in the middle part and T type piles in the circumjacent part. The dock will be the berth for 4 Panama super-type container ships. This project is the key project in Egypt.


 


    We have 7 sets of Jintai machines constructed in Said port as the main force, including 3 sets of SG40A, 1 set of SG35A, 2 sets of SD28W rotary drill and 1 set of SMW ZKD85-3.
The stratum condition: 0-13m sand layer, 13-15m fill-back layer, 15-45m soil layer, 45-57m fine sand layer.


 


    JINTAI machines are praised by the user and Egypt supervisor with good performance.

主站蜘蛛池模板: 东光县| 岫岩| 高阳县| 阿克| 盐山县| 衡阳县| 上虞市| 北票市| 万山特区| 佛山市| 刚察县| 绍兴县| 维西| 临泽县| 伊吾县| 惠来县| 明光市| 任丘市| 安吉县| 万山特区| 济南市| 武威市| 布尔津县| 苏尼特右旗| 土默特左旗| 莱阳市| 三河市| 玉山县| 金华市| 青川县| 蒙阴县| 方山县| 邹城市| 修武县| 大连市| 广丰县| 改则县| 元阳县| 兴海县| 长寿区| 得荣县|